|


March 2005
Tilt-Up provides a
consistent and dependable solution on a global scale.
Site Cast Tilt-Up
Construction is a construction method in which concrete wall panels
are manufactured on site then lifted by mobile crane from their site
casting bed and tilted into place.
This Construction and
Engineering System affords owners:-
1. A cost effective
structure.
2. Energy efficient secure building.
3. Durable building.
With great architectural
versatility and appeal.
This system is fast gaining
devotees from:-
1. The traditional
warehouse and industrial facilities.
2. Office and commercial buildings.
3. Churches.
4. Schools.
5. Movie Theatres.
6. Motel/Hotels.
7. Wineries.
8. Cold Stores.
9. Shopping Walls.
10. Grain Silos.
11. Defence Establishments.
In the United States and
Canada 61 million square metres are constructed using this system
every year.
In Australia, New Zealand
and South Africa, 2 million square metres approximately and growing
exponentially.
Why Tilt-Up is the answer!
·
Variety of panel finishes available
to the design professional.
·
Diversity of colour options.
·
Architectural freedom available by
creating panels in different sizes and shapes.
·
Access by the Architect to add on
shapes and facades as a firm statement to both
the designer and the owner.
Advanced Building Systems
believes its secret to success is.
OUTRAGEOUS
SERVICE.
When you call
Do you want to hear.
Press 1 for ???
Press 2 for ???
Press 3 to return to the original menu
OR
Would you prefer to hear:-
“Good Morning or Good Afternoon
How can we help you”
ABS has the following
mission statement to its clients.
1. Product
reliability is ESSENTIAL.
2. Price must be
competitive but should also include allowance for:-
2.1
Detailed assistance in the use of the product.
2.2 Customer Service.
2.3 On time delivery.
3. Being able to
converse with a knowledgeable person who can answer your queries.
It is this OUTRAGEOUS
SERVICE which sets your business apart from your competitors.
What is more important
to YOU?
Having a crane waiting at
$800/hour to carry out a rigging change?
OR
Paying $7.00 or $8.00 more
for additional components that ELIMINATES THAT WAITING TIME.
|