These days one wonders whether there is such a thing
as good news – “THERE IS”!
Tilt-up maintains its reputation
as a “FAST”, RELIABLE construction system.
In the United States a tilt-up crew
lifted 53 panels of 14.33 metres high and averaging 27t – 36t in one day, which was a
panel every 11.5 minutes.
When those who canvass the benefits of
Tilt-Up construction, phrases such as “fast track”
& “early building occupancy” pervade the
conversation. This
is not idle chatter, but facts which make the tilt-up method
so attractive to developers, financiers and owner-occupiers
alike.
Often, the stories told about
aggressive schedules involve a school, high tech office
building, shopping centres where the occupancy is critical
to meet a specified time frame to catch a market or a time
dependent on a deadline.
The building referred to earlier in
this article was 60,000 square metres, and 202 linear metres
of panels were erected in a 10-hour day.
In other words, the crew, with planning and
ingenuity, worked together to complete 247 panels in just 8
days.
When extensive pre-planning is coupled with
experienced engineering and construction, the tilt-up
process becomes even more efficient, clearly making it the
ideal choice of construction method for the design-build
team, as well as the owner.
ABS is proud to have introduced the
first ground release components to Australia, which allowed
the Tilt-Up System to be so eagerly adopted by developers,
financiers and builders.
The new SLI III 10t face-lift inserts
offer more efficient construction; with cost benefits over
the commonly used 5t face-lift inserts.